.png?mask=1)
PROJECT DETAILS
If the measure passes, the Cobra Dome and Auditorium would receive system upgrades, including: roofing, electrical, mechanical ventilation, ADA upgrades, asbestos abatement, fire alarm, and fire sprinkler.
Currently the auditorium is also used as the cafeteria. If the measure passes, the new classroom wings would include a dedicated kitchen and cafeteria space for students.
The Cobra Dome and Auditorium received a Seismic Grant in 2022 that included seismic upgrades and a replacement of the roof.
Currently, the High School kitchen operates out of 4 separate spaces within the existing building: the food preparation area, the dishwashing area, the dry storage, and the cold storage. If the measure passes, new kitchen and cafeteria would be built.
If the measure passes, a new locker room would be built.
If the measure passes, the elementary school would receive:
- Safety and security upgrades, including a secure main entry
- Energy efficient roof and window replacements
- Restroom expansions
- A dedicated restroom for the Kindergarten building
- Interior updates, including flooring and painting
- Stormwater management improvements
If the measure passes, security upgrades would include:
- New secure main entry and secure exterior doors
- New cameras and intercom system
- Fire safety upgrades
- Improved air quality systems
- Updated electrical infrastructure for safety and reliability
If the the measure passes, the CTE building would receive:
- New shop spaces
- Updated learning environments for career-focused education
This site provides information using PDF, visit this link to download the Adobe Acrobat Reader DC software.